{"id":22471,"date":"2017-07-03T00:00:00","date_gmt":"2017-07-02T21:00:00","guid":{"rendered":"https:\/\/www.nord-vest.ro\/doua-proiecte-importante-de-infrastructura-rutiera-semnate-azi-de-consiliul-judetean-salaj-valoarea-totala-aproape-174-milioane-lei-3\/"},"modified":"2017-07-03T00:00:00","modified_gmt":"2017-07-02T21:00:00","slug":"doua-proiecte-importante-de-infrastructura-rutiera-semnate-azi-de-consiliul-judetean-salaj-valoarea-totala-aproape-174-milioane-lei-3","status":"publish","type":"post","link":"https:\/\/www.nord-vest.ro\/en\/doua-proiecte-importante-de-infrastructura-rutiera-semnate-azi-de-consiliul-judetean-salaj-valoarea-totala-aproape-174-milioane-lei-3\/","title":{"rendered":"Two important road infrastructure projects signed today by the S\u0103laj County Council - the total value is almost 174 million lei"},"content":{"rendered":"<p>Consiliul Jude\u0163ean S\u0103laj, ADR Nord-Vest si AMPOR au semnat, azi, 3 iulie 2017, dou\u0103 \u00a0proiecte importante de infrastructur\u0103 rutier\u0103, finan\u0163ate \u00a0prin Programul Opera\u021bional Regional 2014-2020: \u201c<strong><em>Reabilitare drum jude\u0163ean DJ 191C: Nu\u015ffal\u0103u \u2013 Crasna \u2013 Zal\u0103u \u2013 Creaca\u201d<\/em><\/strong> \u015fi \u201c<strong><em>Reabilitare <\/em><\/strong><strong><em>\u0219<\/em><\/strong><strong><em>i modernizare drum jude\u0163ean DJ 108A: Lim. Jud. Cluj \u2013 Bogdana: KM 7+400 \u2013 19+000\u201d<\/em><\/strong>.<\/p>\n<p><em>\u00a0<\/em>\u00cen ceea ce prive\u015fte proiectul \u201c<strong><em>Reabilitare drum jude\u0163ean DJ 191C: Nu\u015ffal\u0103u \u2013 Crasna \u2013 Zal\u0103u \u2013 Creaca\u201d<\/em><\/strong>, valoarea total\u0103 a contractului este de 120.812.270,74 lei, din care valoarea asisten\u021bei financiare nerambursabile\u00a0 este de 118.003.231,20 lei. \u00cen mod concret, acest proiect vizeaz\u0103 <strong>reabilitarea <\/strong><strong>\u0219<\/strong><strong>i modernizarea a 36,816 km de drum jude<\/strong><strong>\u021b<\/strong><strong>ean,<\/strong> structurat \u00een TRONSON 1 (din localitatea Nu\u015ffal\u0103u, p\u00e2n\u0103 la intersec\u021bia cu \u0219oseaua de centur\u0103 a Municipiului Zal\u0103u) \u0219i TRONSON 2 (de la ie\u0219irea din Municipiul Zal\u0103u, p\u00e2n\u0103 \u00een localitatea Creaca, la intersec\u0163ia cu drumul jude\u0163ean DJ 108A).<\/p>\n<p>Proiectul \u201c<strong><em>Reabilitare <\/em><\/strong><strong><em>\u0219<\/em><\/strong><strong><em>i modernizare drum jude\u0163ean DJ 108A: Lim. Jud. Cluj \u2013 Bogdana: KM 7+400 \u2013 19+000\u201d<\/em><\/strong> are valoarea total\u0103 de 52.999.840,15 lei, din care asisten\u021b\u0103 financiar\u0103 nerambursabil\u0103\u00a0 este de 51.633.336,36 lei<\/p>\n<p>Prin proiect se propune reabilitarea \u0219i\u00a0 modernizarea a 11,6 km din drumul jude\u0163ean DJ108A, tronson care asigur\u0103 continuitatea cu un alt sector de drum reabilitat prin acela\u015fi Program Opera\u0163ional Regional, \u00een perioada 2007-2013. Este vorba de proiectul de \u201eReabilitare a drumului jude\u0163ean Ciucea \u2013 Crasna \u2013V\u00eer\u0219ol\u021b\u201d.<\/p>","protected":false},"excerpt":{"rendered":"<p>Consiliul Jude\u0163ean S\u0103laj, ADR Nord-Vest si AMPOR au semnat, azi, 3 iulie 2017, dou\u0103 \u00a0proiecte importante de infrastructur\u0103 rutier\u0103, finan\u0163ate \u00a0prin Programul Opera\u021bional Regional 2014-2020: \u201cReabilitare drum jude\u0163ean DJ 191C: Nu\u015ffal\u0103u \u2013 Crasna \u2013 Zal\u0103u \u2013 Creaca\u201d \u015fi \u201cReabilitare \u0219i modernizare drum jude\u0163ean DJ 108A: Lim. Jud. Cluj \u2013 Bogdana: KM 7+400 \u2013 19+000\u201d. \u00a0\u00cen&#8230;<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","beyondwords_generate_audio":"","beyondwords_project_id":"","beyondwords_content_id":"","beyondwords_preview_token":"","beyondwords_player_style":"","beyondwords_language_id":"","beyondwords_title_voice_id":"","beyondwords_body_voice_id":"","beyondwords_summary_voice_id":"","beyondwords_error_message":"","beyondwords_disabled":"","beyondwords_delete_content":"","beyondwords_podcast_id":"","beyondwords_hash":"","publish_post_to_speechkit":"","speechkit_hash":"","speechkit_generate_audio":"","speechkit_project_id":"","speechkit_podcast_id":"","speechkit_error_message":"","speechkit_disabled":"","speechkit_access_key":"","speechkit_error":"","speechkit_info":"","speechkit_response":"","speechkit_retries":"","speechkit_status":"","speechkit_updated_at":"","_speechkit_link":"","_speechkit_text":""},"categories":[249],"tags":[],"class_list":["post-22471","post","type-post","status-publish","format-standard","hentry","category-noutati-2"],"publishpress_future_action":{"enabled":false,"date":"2026-04-20 11:26:56","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category"},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts\/22471","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/comments?post=22471"}],"version-history":[{"count":0,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts\/22471\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/media?parent=22471"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/categories?post=22471"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/tags?post=22471"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}