{"id":16472,"date":"2022-03-29T11:33:17","date_gmt":"2022-03-29T08:33:17","guid":{"rendered":"https:\/\/www.nord-vest.ro\/?p=16472"},"modified":"2022-03-29T11:47:54","modified_gmt":"2022-03-29T08:47:54","slug":"au-fost-publicate-in-monitorul-oficial-cele-5-ghiduri-din-pnrr-pentru-apelurile-de-finantare-dedicate-autoritatilor-locale-componenta-5-valul-renovarii","status":"publish","type":"post","link":"https:\/\/www.nord-vest.ro\/en\/au-fost-publicate-in-monitorul-oficial-cele-5-ghiduri-din-pnrr-pentru-apelurile-de-finantare-dedicate-autoritatilor-locale-componenta-5-valul-renovarii\/","title":{"rendered":"The 5 guidelines for the PNRR funding calls dedicated to local authorities were published in the Official Gazette, Component 5 \u2013 The Renovation Wave!"},"content":{"rendered":"<h4 class=\"wp-block-heading\"><strong>Axis 1 \u2013 Grant scheme for energy efficiency and resilience in multi-family residential buildings, Operation A.1 \u2013 Integrated renovation (consolidation of<\/strong>seismic and moderate energy renovation) of multi-family residential buildings<\/h4>\n\n\n\n<p>Eligible applicants: communes, cities, municipalities, county seat municipalities, counties.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Types of works<\/strong><\/td><td><strong>PNRR eligible value (euro)<\/strong><\/td><td><strong>Additional value cf. GEO 124\/2021* (euro)<\/strong><\/td><td><strong>Cumulative value PNRR+GEO 124\/2021 amounts<\/strong><\/td><td><strong>Total eligible value** (euro)&nbsp;<\/strong><\/td><\/tr><tr><td>Seismic consolidation works&nbsp;<\/td><td>100.000.000<\/td><td>30.000.000&nbsp;<\/td><td>130.000.000<\/td><td>123.500.000<\/td><\/tr><tr><td>Moderate energy renovation works<\/td><td>40.000.000&nbsp;<\/td><td>12.000.000&nbsp;<\/td><td>52.000.000<\/td><td>49.400.000<\/td><\/tr><tr><td>Total<\/td><td>140.000.000&nbsp;<\/td><td>42.000.000<\/td><td>182.000.000<\/td><td>172.900.000<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div data-wp-interactive=\"core\/file\" class=\"wp-block-file\"><object data-wp-bind--hidden=\"!state.hasPdfPreview\" hidden class=\"wp-block-file__embed\" data=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-A.1-Renovarea-integrata-2.pdf\" type=\"application\/pdf\" style=\"width:100%;height:600px\" aria-label=\"Embed of \u00cenglobare pentru Operatiunea-A.1-Renovarea-integrata-2..\"><\/object><a id=\"wp-block-file--media-4183cdac-9753-43cb-9de5-b5fdb79a004b\" href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-A.1-Renovarea-integrata-2.pdf\">Operation-A.1-Integrated-Renovation-2<\/a><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-A.1-Renovarea-integrata-2.pdf\" class=\"wp-block-file__button\" download aria-describedby=\"wp-block-file--media-4183cdac-9753-43cb-9de5-b5fdb79a004b\">Unload<\/a><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Axis 1 \u2013 Grant scheme for energy efficiency and resilience in multi-family residential buildings, Operation A.2 \u2013 Moderate energy renovation of multi-family residential buildings for communities at risk of poverty and social exclusion<\/strong><\/h4>\n\n\n\n<p>Eligible applicants: communes, cities, municipalities, county seat municipalities, counties.<\/p>\n\n\n\n<p>Financial allocation from PNRR: 177,500,000 Euro<\/p>\n\n\n\n<p>Total eligible financial allocation: 219,212,500 Euros.<\/p>\n\n\n\n<div data-wp-interactive=\"core\/file\" class=\"wp-block-file\"><object data-wp-bind--hidden=\"!state.hasPdfPreview\" hidden class=\"wp-block-file__embed\" data=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-A.2-Renovarea-energetica-moderata-a-cladirilor-multifamiliale-1.pdf\" type=\"application\/pdf\" style=\"width:100%;height:600px\" aria-label=\"Embed of \u00cenglobare pentru Operatiunea-A.2-Renovarea-energetica-moderata-a-cladirilor-multifamiliale-1..\"><\/object><a id=\"wp-block-file--media-2e88d707-6239-43b9-b56e-a6e2453f38af\" href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-A.2-Renovarea-energetica-moderata-a-cladirilor-multifamiliale-1.pdf\">Operation-A.2-Moderate-energy-renovation-of-multi-family-buildings-1<\/a><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-A.2-Renovarea-energetica-moderata-a-cladirilor-multifamiliale-1.pdf\" class=\"wp-block-file__button\" download aria-describedby=\"wp-block-file--media-2e88d707-6239-43b9-b56e-a6e2453f38af\">Unload<\/a><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Axis 1 \u2013 Grant scheme for energy efficiency and resilience in multi-family residential buildings, Operation A.3 \u2013 Moderate or deep energy renovation of multi-family residential buildings<\/strong><\/h4>\n\n\n\n<p>Eligible applicants: communes, cities, municipalities, county seat municipalities, counties.<\/p>\n\n\n\n<p>The financial allocation granted by the PNRR is 670,000,000 Euros.<\/p>\n\n\n\n<div data-wp-interactive=\"core\/file\" class=\"wp-block-file\"><object data-wp-bind--hidden=\"!state.hasPdfPreview\" hidden class=\"wp-block-file__embed\" data=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-A.3-Renovarea-energetica-moderata-sau-aprofundata-a-cladirilor-rezidentiale-multifamiliale-1.pdf\" type=\"application\/pdf\" style=\"width:100%;height:600px\" aria-label=\"Embed of \u00cenglobare pentru Operatiunea-A.3-Renovarea-energetica-moderata-sau-aprofundata-a-cladirilor-rezidentiale-multifamiliale-1..\"><\/object><a id=\"wp-block-file--media-1cc4fff4-db43-466c-8b75-27f265135ab5\" href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-A.3-Renovarea-energetica-moderata-sau-aprofundata-a-cladirilor-rezidentiale-multifamiliale-1.pdf\">Operation-A.3-Moderate-or-deep-energy-renovation-of-multi-family-residential-buildings-1<\/a><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-A.3-Renovarea-energetica-moderata-sau-aprofundata-a-cladirilor-rezidentiale-multifamiliale-1.pdf\" class=\"wp-block-file__button\" download aria-describedby=\"wp-block-file--media-1cc4fff4-db43-466c-8b75-27f265135ab5\">Unload<\/a><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Axis 2 \u2013 Grant scheme for energy efficiency and resilience in public buildings, Operation B.1: Integrated renovation (seismic strengthening and moderate energy renovation) of public buildings<\/strong><\/h4>\n\n\n\n<p>Eligible applicants: Central public authorities, local public authorities and institutions or partnerships between the previously specified institutions.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Types of works<\/strong><\/td><td><strong>PNRR eligible value (euro)<\/strong><\/td><td><strong>Additional value cf. GEO 124\/2021* (euro)<\/strong><\/td><td><strong>Total eligible value** (euro)&nbsp;<\/strong><\/td><\/tr><tr><td>Seismic consolidation works&nbsp;<\/td><td>117.000.000<\/td><td>35.100.000&nbsp;<\/td><td>152.100.000<\/td><\/tr><tr><td>Moderate energy renovation works<\/td><td>102.960.000&nbsp;<\/td><td>30.888.000<\/td><td>133.848.000&nbsp;<\/td><\/tr><tr><td>Total<\/td><td>219.960.000&nbsp;<\/td><td>65.988.000&nbsp;<\/td><td>285.948.000<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div data-wp-interactive=\"core\/file\" class=\"wp-block-file\"><object data-wp-bind--hidden=\"!state.hasPdfPreview\" hidden class=\"wp-block-file__embed\" data=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-B.1-Renovarea-integrata-consolidare-seismica-1.pdf\" type=\"application\/pdf\" style=\"width:100%;height:600px\" aria-label=\"Embed of \u00cenglobare pentru Operatiunea-B.1-Renovarea-integrata-consolidare-seismica-1..\"><\/object><a id=\"wp-block-file--media-c0d16f3e-7952-4f9e-8e57-13e7d82223a2\" href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-B.1-Renovarea-integrata-consolidare-seismica-1.pdf\">Operation-B.1-Renovation-integrated-seismic-consolidation-1<\/a><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-B.1-Renovarea-integrata-consolidare-seismica-1.pdf\" class=\"wp-block-file__button\" download aria-describedby=\"wp-block-file--media-c0d16f3e-7952-4f9e-8e57-13e7d82223a2\">Unload<\/a><\/div>\n\n\n\n<h4 class=\"wp-block-heading\"><strong>Axis 2 \u2013 Grant scheme for energy efficiency and resilience in public buildings, Operation B.2: Moderate or deep energy renovation of public buildings<\/strong><\/h4>\n\n\n\n<p>Eligible applicants: Central public authorities, local public authorities and institutions or partnerships between the previously specified institutions.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><strong>Types of works<\/strong><\/td><td><strong>PNRR eligible value (euro)<\/strong><\/td><td><strong>Additional value cf. GEO 124\/2021* (euro)<\/strong><\/td><td><strong>Total eligible value** (euro)&nbsp;<\/strong><\/td><\/tr><tr><td>Seismic consolidation works&nbsp;<\/td><td>117.000.000<\/td><td>35.100.000&nbsp;<\/td><td>152.100.000<\/td><\/tr><tr><td>Moderate energy renovation works<\/td><td>102.960.000&nbsp;<\/td><td>30.888.000<\/td><td>133.848.000&nbsp;<\/td><\/tr><tr><td>Total<\/td><td>219.960.000&nbsp;<\/td><td>65.988.000&nbsp;<\/td><td>285.948.000<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<div data-wp-interactive=\"core\/file\" class=\"wp-block-file\"><object data-wp-bind--hidden=\"!state.hasPdfPreview\" hidden class=\"wp-block-file__embed\" data=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-B.2-Renovarea-energetica-moderata-sau-aprofundata-a-cladirilor-publice-1.pdf\" type=\"application\/pdf\" style=\"width:100%;height:600px\" aria-label=\"Embed of \u00cenglobare pentru Operatiunea-B.2-Renovarea-energetica-moderata-sau-aprofundata-a-cladirilor-publice-1..\"><\/object><a id=\"wp-block-file--media-ebce2a12-b9ad-49f2-9f7b-128ce89a5067\" href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-B.2-Renovarea-energetica-moderata-sau-aprofundata-a-cladirilor-publice-1.pdf\">Operation-B.2-Moderate-or-deep-energy-renovation-of-public-buildings-1<\/a><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Operatiunea-B.2-Renovarea-energetica-moderata-sau-aprofundata-a-cladirilor-publice-1.pdf\" class=\"wp-block-file__button\" download aria-describedby=\"wp-block-file--media-ebce2a12-b9ad-49f2-9f7b-128ce89a5067\">Unload<\/a><\/div>\n\n\n\n<p>Source: mdlpa.ro and fundoni-structurale.ro<\/p>","protected":false},"excerpt":{"rendered":"<p>Axa 1 \u2013 Schema de granturi pentru eficien\u021b\u0103 energetic\u0103 \u0219i rezilien\u021b\u0103 \u00een cl\u0103diri reziden\u021biale multifamiliale,&nbsp;Opera\u021biunea A.1 \u2013 Renovarea integrat\u0103 (consolidare seismic\u0103 \u0219i renovarea energetic\u0103 moderat\u0103) a cl\u0103dirilor reziden\u021biale multifamiliale Solicitan\u021bi eligibili: comune, ora\u0219e, municipii, municipiiile re\u0219edin\u021b\u0103 de jude\u021b, jude\u021be. Tipuri de lucr\u0103ri Valoare eligibil\u0103 PNRR (euro) Valoare suplimentar\u0103 cf. OUG 124\/2021* (euro) Valoare cumulat\u0103 PNRR+sume&#8230;<\/p>","protected":false},"author":1,"featured_media":16484,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","beyondwords_generate_audio":"","beyondwords_project_id":"","beyondwords_content_id":"","beyondwords_preview_token":"","beyondwords_player_style":"","beyondwords_language_id":"","beyondwords_title_voice_id":"","beyondwords_body_voice_id":"","beyondwords_summary_voice_id":"","beyondwords_error_message":"","beyondwords_disabled":"","beyondwords_delete_content":"","beyondwords_podcast_id":"","beyondwords_hash":"","publish_post_to_speechkit":"","speechkit_hash":"","speechkit_generate_audio":"","speechkit_project_id":"","speechkit_podcast_id":"","speechkit_error_message":"","speechkit_disabled":"","speechkit_access_key":"","speechkit_error":"","speechkit_info":"","speechkit_response":"","speechkit_retries":"","speechkit_status":"","speechkit_updated_at":"","_speechkit_link":"","_speechkit_text":""},"categories":[13],"tags":[],"class_list":["post-16472","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noutati"],"publishpress_future_action":{"enabled":false,"date":"2026-04-22 12:06:24","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category"},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts\/16472","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/comments?post=16472"}],"version-history":[{"count":4,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts\/16472\/revisions"}],"predecessor-version":[{"id":16489,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts\/16472\/revisions\/16489"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/media\/16484"}],"wp:attachment":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/media?parent=16472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/categories?post=16472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/tags?post=16472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}