{"id":13949,"date":"2020-10-13T15:03:56","date_gmt":"2020-10-13T12:03:56","guid":{"rendered":"http:\/\/www.nord-vest.ro\/?p=13949"},"modified":"2020-10-14T12:38:28","modified_gmt":"2020-10-14T09:38:28","slug":"portofoliu-de-proiecte-in-pregatire-pentru-perioada-2021-2027","status":"publish","type":"post","link":"https:\/\/www.nord-vest.ro\/en\/portofoliu-de-proiecte-in-pregatire-pentru-perioada-2021-2027\/","title":{"rendered":"Portfolio of projects in preparation for the period 2021-2027"},"content":{"rendered":"<p>By GEO no. 88\/27.05.2020, the Government of Romania approved the establishment of measures regarding the granting of financial support from non-reimbursable European funds, in the current programming period 2014-2020, for the preparation of the portfolio of projects in strategic fields considered a priority for Romania in the programming period 2021- 2027. The funding is granted through the Technical Assistance Operational Program 2014-2020 (POAT 2014-2020) and through the Large Infrastructure Operational Program 2014-2020 (POIM 2014-2020).<\/p>\n\n\n\n<p>The Ministry of European Funds (MFE) through the POAT 2014-2020 Management Authority published on July 17, 2020 <em>The applicant&#039;s guide \u2013 specific conditions for accessing the funds intended for the preparation of infrastructure projects in the fields<\/em><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><em>urban mobility,<\/em><em><\/em><\/li><li><em>urban regeneration, <\/em><em><\/em><\/li><li><em>road infrastructure of county interest, including detours and\/or connecting roads, <\/em><em><\/em><\/li><li><em>leisure centres\/tourist bases (school camps) and <\/em><em><\/em><\/li><li><em>infrastructure and public tourism services, including heritage sites with tourism potential.<\/em><em><\/em><\/li><\/ul>\n\n\n\n<p>This call for projects comes to the aid of several types of administrative-territorial units (UATs, ADIs) and the Ministry of Tourism with non-refundable funding for the development of technical-economic documentation in order to prepare a portfolio of projects in the period of 2021 -2027.<\/p>\n\n\n\n<p>The financial allocation related to the North-West Development Region to support the preparation of the technical-economic documentation for the 5 fields is <strong>38,680,615 lei,<\/strong> from 304,031,854 lei allocated at country level.<\/p>\n\n\n\n<p>Following the selection of project files submitted between 29.07.2020 and 21.08.2020, based on the Methodology for the evaluation of POAT 2014-2020 NV project files, 45 technical-economic documents were identified, as follows:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><em>urban mobility \u2013 16 projects<\/em><\/li><li><em>urban regeneration \u2013 15 projects<\/em><\/li><li><em>road infrastructure of county interest, including detours and\/or connecting roads \u2013 6 projects<\/em><\/li><li><em>recreation centers\/tourist centers (school camps) \u2013 2 projects<\/em><\/li><li><em>infrastructure and public tourism services, including heritage sites with tourism potential \u2013 6 projects<\/em><\/li><\/ul>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Urban Mobility<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><\/td><td><strong>Beneficiary<\/strong><\/td><td><strong>Project Title<\/strong><\/td><td><strong>Total investment value for the project (LEI)<\/strong><\/td><\/tr><tr><td>1<\/td><td>Baia Mare municipality<\/td><td>Sustainable urban mobility through the creation of the major shared public transport system and &quot;park and ride&quot; in the Municipality of Baia Mare&nbsp;<\/td><td>143,746,050.00<\/td><\/tr><tr><td>2<\/td><td>Oradea municipality<\/td><td>The Magheru - Republic mobility corridor in Oradea Municipality<\/td><td>143,746,050.00<\/td><\/tr><tr><td>3<\/td><td>The municipality of Cluj-Napoca<\/td><td>The increase of the pedestrian area and the development of sustainable ecological mobility on the East-West Axis, a strategic mobility corridor, in two sections: 1.) the Piata Mara\u0219ti area and the adjacent streets (21 Decembrie 1989 avenue \u2013 partially, A. Vlaicu street \u2013 partially, strada Fabricii - partially, Aleea Bibliotecii and the adjacent area) and 2.) Calea Motilor, Calea M\u0103n\u0103\u015ftur, Str. Uzinei Electrice, Str. Marginasa&quot;<\/td><td>143,692,500.00<\/td><\/tr><tr><td>4<\/td><td>The municipality of Zalau<\/td><td>Modernization of the shared public transport system, Zal\u0103u municipality<br><\/td><td>67.200.000<\/td><\/tr><tr><td>5<\/td><td>Bistrita municipality<\/td><td>Mobility corridor related to the Bistrita river<\/td><td>144,109,000.00<\/td><\/tr><tr><td>6<\/td><td>The municipality of Satu Mare<\/td><td>Development of supporting infrastructure and environment<\/td><td>108.000.000<\/td><\/tr><tr><td>7<\/td><td>Seini<\/td><td>Increasing the capacity of non-motorized transport in the city of Seini<\/td><td>72,599,758.00<\/td><\/tr><tr><td>8<\/td><td>Sprie bathroom<\/td><td>Creating the Baia-Sprie-Mogosa-Suior mobility corridor by building a Park and Ride, developing the bike-sharing infrastructure, by arranging pedestrian access to the bike-sharing areas<\/td><td>36,238,500.00<\/td><\/tr><tr><td>9<\/td><td>I choose<\/td><td>Urban mobility corridor: Alesd Sud- Alesd Nord<\/td><td>29,363,980.66<\/td><\/tr><tr><td>10<\/td><td>Already<\/td><td>Increasing sustainable urban mobility in the municipality of Dej through the purchase of electric buses, the expansion and development of the bicycle and pedestrian infrastructure on the Valea Jichis route.<\/td><td>53,350,000.00<\/td><\/tr><tr><td>11<\/td><td>Star<\/td><td>Urban mobility corridor in the city of Stei<\/td><td>38,936,169.69<\/td><\/tr><tr><td>12<\/td><td>The living room<\/td><td>Urban Mobility by creating bicycle and pedestrian paths<\/td><td>71,993,820.00<\/td><\/tr><tr><td>13<\/td><td>Michael&#039;s Valley<\/td><td>Reducing carbon emissions in Valea lui Mihai City, Bihor County - stage 2<\/td><td>32,775,836.00<\/td><\/tr><tr><td>14<\/td><td>Dirty<\/td><td>Development of urban mobility III- Beclean Smart City<\/td><td>37,926,906.93<\/td><\/tr><tr><td>15<\/td><td>Daisy<\/td><td>Creation of an integrated mobility corridor in the Municipality of Marghita1<\/td><td>28,805,601.60<\/td><\/tr><tr><td>16<\/td><td>Huedin<\/td><td>Integrated mobility in Huedin<\/td><td>71.510.640\u00a0<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Urban Regeneration<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Beneficiary<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Project Title<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Total investment value for the project (LEI)<\/strong><\/td><\/tr><tr><td>1<\/td><td class=\"has-text-align-center\" data-align=\"center\">Baia Mare municipality<\/td><td class=\"has-text-align-center\" data-align=\"center\">Sustainable urban regeneration through the rehabilitation of some markets, parks and bike paths in the Municipality of Baia Mare.<\/td><td class=\"has-text-align-center\" data-align=\"center\">43,123,815.00<\/td><\/tr><tr><td>2<\/td><td class=\"has-text-align-center\" data-align=\"center\">Oradea municipality<\/td><td class=\"has-text-align-center\" data-align=\"center\">&quot;Urban regeneration and increasing the quality of green spaces in the Municipality of Oradea&quot;<\/td><td class=\"has-text-align-center\" data-align=\"center\">43,123,815.00<\/td><\/tr><tr><td>3<\/td><td class=\"has-text-align-center\" data-align=\"center\">The municipality of Cluj<\/td><td class=\"has-text-align-center\" data-align=\"center\">Rehabilitation of IL Caragiale park and Octavian Petrovici street<\/td><td class=\"has-text-align-center\" data-align=\"center\">25.547.494,05<\/td><\/tr><tr><td>4<\/td><td class=\"has-text-align-center\" data-align=\"center\">The municipality of Zalau<\/td><td class=\"has-text-align-center\" data-align=\"center\">Urban regeneration CET Zal\u0103u area<\/td><td class=\"has-text-align-center\" data-align=\"center\">1,920,000.00<\/td><\/tr><tr><td>5<\/td><td class=\"has-text-align-center\" data-align=\"center\">Bistrita municipality<\/td><td class=\"has-text-align-center\" data-align=\"center\">Urban regeneration in the Lac MHC area<\/td><td class=\"has-text-align-center\" data-align=\"center\">43,232,700.00<\/td><\/tr><tr><td>6<\/td><td class=\"has-text-align-center\" data-align=\"center\">The municipality of Satu Mare<\/td><td class=\"has-text-align-center\" data-align=\"center\">Reconversion and re-functionalization of degraded and unused land located on the banks of Some\u0219<\/td><td class=\"has-text-align-center\" data-align=\"center\">26,091,720.00<\/td><\/tr><tr><td>7<\/td><td class=\"has-text-align-center\" data-align=\"center\">Seini<\/td><td class=\"has-text-align-center\" data-align=\"center\">Arrangement of urban public space<\/td><td class=\"has-text-align-center\" data-align=\"center\">24,190,320.00<\/td><\/tr><tr><td>8<\/td><td class=\"has-text-align-center\" data-align=\"center\">Sacks<\/td><td class=\"has-text-align-center\" data-align=\"center\">A greener S\u0103cueni&nbsp;<\/td><td class=\"has-text-align-center\" data-align=\"center\">19,126,558.00<\/td><\/tr><tr><td>9<\/td><td class=\"has-text-align-center\" data-align=\"center\">Already<\/td><td class=\"has-text-align-center\" data-align=\"center\">Functional reconversion and\/or reuse of abandoned and unused land and surfaces in the Dealul Florilor district, Dej.1 municipality<\/td><td class=\"has-text-align-center\" data-align=\"center\">6,078,411.84<\/td><\/tr><tr><td>10<\/td><td class=\"has-text-align-center\" data-align=\"center\">Star<\/td><td class=\"has-text-align-center\" data-align=\"center\">Urban regeneration of green spaces, derelict and degraded spaces in the city of \u0218tei 1<\/td><td class=\"has-text-align-center\" data-align=\"center\">27,636,107.28<\/td><\/tr><tr><td>11<\/td><td class=\"has-text-align-center\" data-align=\"center\">Michael&#039;s Valley<\/td><td class=\"has-text-align-center\" data-align=\"center\">The green valley<\/td><td class=\"has-text-align-center\" data-align=\"center\">16,058,812.00<\/td><\/tr><tr><td>12<\/td><td class=\"has-text-align-center\" data-align=\"center\">Dirty<\/td><td class=\"has-text-align-center\" data-align=\"center\">Development and Regeneration of public spaces in the city of Beclean<\/td><td class=\"has-text-align-center\" data-align=\"center\">24,984,646.93<\/td><\/tr><tr><td>13<\/td><td class=\"has-text-align-center\" data-align=\"center\">Turda<\/td><td class=\"has-text-align-center\" data-align=\"center\">Regeneration of the degraded area in the Bai Sarate neighborhood, Turda, by creating a new public urban park.<\/td><td class=\"has-text-align-center\" data-align=\"center\">28,749,210.00<\/td><\/tr><tr><td>14<\/td><td class=\"has-text-align-center\" data-align=\"center\">Nasaud<\/td><td class=\"has-text-align-center\" data-align=\"center\">The urban regeneration of the neighborhood of blocks, in the city of N\u0103s\u0103ud, Bistrita N\u0103s\u0103ud County - stage I.<\/td><td class=\"has-text-align-center\" data-align=\"center\">14,495,400.00<\/td><\/tr><tr><td>15<\/td><td class=\"has-text-align-center\" data-align=\"center\">Daisy<\/td><td class=\"has-text-align-center\" data-align=\"center\">Urban regeneration measures in Marghita Municipality<\/td><td class=\"has-text-align-center\" data-align=\"center\">6,283,272.72<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Road infrastructure of county interest<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><\/td><td><strong>Beneficiary<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Project Title<\/strong><\/td><td><strong>Total investment value for the project (LEI)<\/strong><\/td><\/tr><tr><td>1<\/td><td>CJ Cluj<\/td><td class=\"has-text-align-center\" data-align=\"center\">Preparation of the technical-economic documentation related to the county road DJ 103K km 9+435 \u2013 km 35+155, for the preparation of the project financed from the programming period 2021-2027<\/td><td>62,136,948.00<\/td><\/tr><tr><td>2<\/td><td>CJ Bihor<\/td><td class=\"has-text-align-center\" data-align=\"center\">Rehabilitation DJ709A: Belfir, &gt; (DJ792A) \u2013 Soimi \u2013 Pocola (DN 76), Bihor County<\/td><td>94,058,790.36<\/td><\/tr><tr><td>3<\/td><td>CJ Bistrita Nasaud<\/td><td class=\"has-text-align-center\" data-align=\"center\">Rehabilitation DJ151 km 45+810-126+736<\/td><td>221,656,409.00<\/td><\/tr><tr><td>4<\/td><td>CJ Satu Mare<\/td><td class=\"has-text-align-center\" data-align=\"center\">Modernization of county road DJ193 Satu Mare-Borlesti-Maramures county border, km 1+300-41+300<\/td><td>163,100.00<\/td><\/tr><tr><td>5<\/td><td>CJ Salaj<\/td><td class=\"has-text-align-center\" data-align=\"center\">The Mese\u0219ului Road<\/td><td>213,262,066.54<\/td><\/tr><tr><td>6<\/td><td>CJ Maramures<\/td><td class=\"has-text-align-center\" data-align=\"center\">Mara-North<\/td><td>222,557,984.00<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Leisure centers\/tourist bases (school camps)<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Beneficiary<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Project Title<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Total investment value for the project (LEI)<\/strong><\/td><\/tr><tr><td>1<\/td><td class=\"has-text-align-center\" data-align=\"center\">Ministry of Tourism<\/td><td class=\"has-text-align-center\" data-align=\"center\">Rehabilitation of the Leisure Center &quot;S\u00e2ngeorz-B\u0103i&quot;<\/td><td class=\"has-text-align-center\" data-align=\"center\">14,374,605.00<\/td><\/tr><tr><td>2<\/td><td class=\"has-text-align-center\" data-align=\"center\">Ministry of Tourism<\/td><td class=\"has-text-align-center\" data-align=\"center\">Rehabilitation of the Leisure Center &quot;UABS \u0218uncuius&quot;<\/td><td class=\"has-text-align-center\" data-align=\"center\">15,237,081.30<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p><strong>Public tourism infrastructure and services, including heritage sites with tourism potential<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td><\/td><td><strong>Beneficiary<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Project Title<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Total investment value for the project (LEI)<\/strong><\/td><\/tr><tr><td>1<\/td><td>Carei\/CJ Satu Mare<\/td><td class=\"has-text-align-center\" data-align=\"center\">The integrated and sustainable development of heritage and cultural tourism in the municipality of Carei \u2013 Karolyi Complex and Dendrological Park<\/td><td class=\"has-text-align-center\" data-align=\"center\">57,498,420.00<\/td><\/tr><tr><td>2<\/td><td>CJ Bistrita Nasaud<\/td><td class=\"has-text-align-center\" data-align=\"center\">Rehabilitation of the Castle of Teleki Comlod<\/td><td class=\"has-text-align-center\" data-align=\"center\">17,824,510.20<\/td><\/tr><tr><td>3<\/td><td>CJ Salaj<\/td><td class=\"has-text-align-center\" data-align=\"center\">Update of technical and economic documentation for the &quot;Beldy Castle Complex Restoration&quot; project.<\/td><td class=\"has-text-align-center\" data-align=\"center\">17,792,587.66<\/td><\/tr><tr><td>4<\/td><td>Cluj-Napoca<\/td><td class=\"has-text-align-center\" data-align=\"center\">Development of the Cet\u0103tuia urban complex in Cluj-Napoca<\/td><td class=\"has-text-align-center\" data-align=\"center\">86,247,630.00<\/td><\/tr><tr><td>5<\/td><td>Oradea city<\/td><td class=\"has-text-align-center\" data-align=\"center\">The rehabilitation, restoration and re-functionalization of the walls of the Oradea fortress (bastions, curtains and counterscarp) in order to introduce them into the tourist circuit - Oradea Fortress - European multicultural and multi-denominational center - stage IV1<\/td><td class=\"has-text-align-center\" data-align=\"center\">86,247,630.00<\/td><\/tr><tr><td>6<\/td><td>Seini\/ CJ MM<\/td><td class=\"has-text-align-center\" data-align=\"center\">Synagogue building restoration<\/td><td class=\"has-text-align-center\" data-align=\"center\">24,149,336.40<\/td><\/tr><\/tbody><\/table><\/figure>","protected":false},"excerpt":{"rendered":"<p>Prin OUG nr. 88\/27.05.2020, Guvernul Rom\u00e2niei a aprobat instituirea unor m\u0103suri privind acordarea de sprijin financiar din fonduri europene nerambursabile, \u00een actuala perioad\u0103 de programare 2014-2020, pentru preg\u0103tirea portofoliului de proiecte \u00een domenii strategice considerate prioritare pentru Rom\u00e2nia \u00een perioada de programare 2021-2027. Finan\u0163area este acordat\u0103 prin Programul Opera\u0163ional Asisten\u0163\u0103 Tehnic\u0103 2014-2020 (POAT 2014-2020) \u015fi&#8230;<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","beyondwords_generate_audio":"","beyondwords_project_id":"","beyondwords_content_id":"","beyondwords_preview_token":"","beyondwords_player_style":"","beyondwords_language_id":"","beyondwords_title_voice_id":"","beyondwords_body_voice_id":"","beyondwords_summary_voice_id":"","beyondwords_error_message":"","beyondwords_disabled":"","beyondwords_delete_content":"","beyondwords_podcast_id":"","beyondwords_hash":"","publish_post_to_speechkit":"","speechkit_hash":"","speechkit_generate_audio":"","speechkit_project_id":"","speechkit_podcast_id":"","speechkit_error_message":"","speechkit_disabled":"","speechkit_access_key":"","speechkit_error":"","speechkit_info":"","speechkit_response":"","speechkit_retries":"","speechkit_status":"","speechkit_updated_at":"","_speechkit_link":"","_speechkit_text":""},"categories":[95],"tags":[],"class_list":["post-13949","post","type-post","status-publish","format-standard","hentry","category-planificare"],"publishpress_future_action":{"enabled":false,"date":"2026-04-24 02:24:54","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category"},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts\/13949","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/comments?post=13949"}],"version-history":[{"count":5,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts\/13949\/revisions"}],"predecessor-version":[{"id":13991,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts\/13949\/revisions\/13991"}],"wp:attachment":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/media?parent=13949"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/categories?post=13949"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/tags?post=13949"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}