{"id":12258,"date":"2019-12-11T16:50:51","date_gmt":"2019-12-11T14:50:51","guid":{"rendered":"http:\/\/www.nord-vest.ro\/?p=12258"},"modified":"2020-12-02T14:26:48","modified_gmt":"2020-12-02T12:26:48","slug":"dezvoltarea-infrastructurii-de-educatie-tehnologica-prin-modernizarea-colegiului-tehnic-transilvania-din-municipiul-baia-mare","status":"publish","type":"post","link":"https:\/\/www.nord-vest.ro\/en\/dezvoltarea-infrastructurii-de-educatie-tehnologica-prin-modernizarea-colegiului-tehnic-transilvania-din-municipiul-baia-mare\/","title":{"rendered":"The development of the technological education infrastructure through the modernization of the &quot;Transilvania&quot; Technical College in the Municipality of Baia Mare"},"content":{"rendered":"<p>The financing contract was signed for the project &quot;Development of the technological education infrastructure through the modernization of the &quot;Transilvania&quot; Technical College in the Municipality of Baia Mare&quot;. <\/p>\n\n\n\n<p>The project is financed through ROP 2014-2020 within Priority Axis 4 - Supporting sustainable urban development, Specific Objective 4.5 - Increasing the quality of educational infrastructure relevant to the labor market.<\/p>\n\n\n\n<p>The aim of the project is to increase the quality of the workshop-type educational infrastructure of the school belonging to the Transilvania Technical College in Baia Mare, with the aim of becoming relevant for the local and regional labor market.<br> The specific objectives of the project are:<\/p>\n\n\n\n<ol class=\"wp-block-list\"><li>Rehabilitation, modernization and equipping of the educational infrastructure for professional and technical education of the Technical College<br> Transylvania from Baia Mare<\/li><li>Increasing the quality of the educational infrastructure by creating a thermal comfort suitable for the educational act<\/li><li>Adequate endowment of school workshops in order to increase the quality of infrastructure relevant to the labor market<\/li><li>Increasing the energy efficiency of the buildings belonging to Transilvania Baia Mare College through thermal rehabilitation works, having<br>as an effect reducing CO2 emissions<\/li><li>Improving the urban aspect and increasing the architectural value of Baia Mare Municipality.<\/li><li>Reduction of the budgetary effort due to the decrease in utility expenses related to the modernized constructions, which are the object of the project.<\/li><\/ol>\n\n\n\n<p>The project implementation period is 63 months, from 15.03.2017 to 31.05.2022<\/p>\n\n\n\n<p>The total value of the project is 23,638,784.28 lei, of which non-refundable financial support from the European Regional Development Fund is 2,157,066.74 lei.<\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>A fost semnat contractul de finan\u021bare pentru proiectul \u201dDezvoltarea infrastructurii de educatie tehnologica prin modernizarea Colegiului Tehnic &#8222;Transilvania&#8221; din Municipiul Baia Mare\u201d. Proiectul este finan\u021bat prin POR 2014-2020 \u00een cadrul Axei Prioritare 4 &#8211; Sprijinirea dezvolt\u0103rii urbane durabile, Obiectiv Specific 4.5-Cre\u015fterea calit\u0103\u0163ii infrastructurii educa\u0163ionale relevante pentru pia\u0163a for\u0163ei de munc\u0103. Scopul proiectului este cre\u0219terea calit\u0103\u021bii&#8230;<\/p>","protected":false},"author":1,"featured_media":8881,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","beyondwords_generate_audio":"","beyondwords_project_id":"","beyondwords_content_id":"","beyondwords_preview_token":"","beyondwords_player_style":"","beyondwords_language_id":"","beyondwords_title_voice_id":"","beyondwords_body_voice_id":"","beyondwords_summary_voice_id":"","beyondwords_error_message":"","beyondwords_disabled":"","beyondwords_delete_content":"","beyondwords_podcast_id":"","beyondwords_hash":"","publish_post_to_speechkit":"","speechkit_hash":"","speechkit_generate_audio":"","speechkit_project_id":"","speechkit_podcast_id":"","speechkit_error_message":"","speechkit_disabled":"","speechkit_access_key":"","speechkit_error":"","speechkit_info":"","speechkit_response":"","speechkit_retries":"","speechkit_status":"","speechkit_updated_at":"","_speechkit_link":"","_speechkit_text":""},"categories":[216],"tags":[],"class_list":["post-12258","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-semnare-contracte-por-2014-2020"],"publishpress_future_action":{"enabled":false,"date":"2026-04-20 19:24:26","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category"},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts\/12258","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/comments?post=12258"}],"version-history":[{"count":3,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts\/12258\/revisions"}],"predecessor-version":[{"id":14289,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/posts\/12258\/revisions\/14289"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/media\/8881"}],"wp:attachment":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/media?parent=12258"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/categories?post=12258"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/tags?post=12258"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}