{"id":27644,"date":"2023-09-19T15:40:25","date_gmt":"2023-09-19T12:40:25","guid":{"rendered":"https:\/\/www.nord-vest.ro\/?page_id=27644"},"modified":"2023-09-19T15:40:25","modified_gmt":"2023-09-19T12:40:25","slug":"situatii-statistice-regio","status":"publish","type":"page","link":"https:\/\/www.nord-vest.ro\/en\/por-2014-2020\/situatii-statistice-regio\/","title":{"rendered":"REGIO statistical situations"},"content":{"rendered":"<section class=\"l-section wpb_row height_huge with_img\"><div class=\"l-section-img\" role=\"img\" aria-label=\"Image\" data-img-width=\"2560\" data-img-height=\"1440\" style=\"background-image: url(https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/11\/DSC09970-scaled.jpg);\"><\/div><div class=\"l-section-overlay\" style=\"background:rgba(26,26,26,0.50)\"><\/div><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row us_custom_8ec37ca1 height_small\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><nav class=\"g-breadcrumbs separator_custom align_left\"><div class=\"g-breadcrumbs-item\"><a href=\"https:\/\/www.nord-vest.ro\/en\/\">Home<\/a><meta content=\"1\"\/><\/div><div class=\"g-breadcrumbs-separator\">\/<\/div><div class=\"g-breadcrumbs-item\">Pages<\/div><\/nav><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row us_custom_3191277e height_small\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><div class=\"wpb_text_column\"><div class=\"wpb_wrapper\">\n<table id=\"tablepress-1\" class=\"tablepress tablepress-id-1\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">REGIO statistical situations<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2023\/04\/Situatie-contracte-semnate-POR-2014-2020-la-31.03.2023.xlsx\" target=\"_blank\" rel=\"noopener\">Lista contractelor de finan\u021bare POR 2014-2020, semnate p\u00e2n\u0103 la data de 31.03.2023 \u00een Regiunea de Dezvoltare Nord-Vest, poate fi consult\u0103 aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2023\/03\/28.02.2023_Contractesemnate_POR14-20.pdf\" target=\"_blank\" rel=\"noopener\">Situa\u021bia contractelor semnate \u00een cadrul POR 2014-2020 \u0219i gradul de contractare p\u00e2n\u0103 la data de 28.02.2023 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2023\/03\/28.02.2023_CFdepuse_POR14-20.pdf\" target=\"_blank\" rel=\"noopener\">Situa\u021bia proiectelor depuse \u00een cadrul POR 2014-2020 \u0219i gradul de acoperire a aloc\u0103rii financiare disponibile, p\u00e2n\u0103 la data de 28.02.2023 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2023\/03\/Situatie-contracte-semnate-POR-2014-2020-la-28.02.2023.xlsx\">Lista contractelor de finan\u021bare POR 2014-2020, semnate p\u00e2n\u0103 la data de 28.02.2023 \u00een Regiunea de Dezvoltare Nord-Vest, poate fi consult\u0103 aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2023\/02\/31.01.2023_Contractesemnate_POR14-20.pdf\">Situa\u021bia contractelor semnate \u00een cadrul POR 2014-2020 \u0219i gradul de contractare p\u00e2n\u0103 la data de 31.01.2023 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2023\/02\/31.01.2023_CFdepuse_POR14-20.pdf\">Situa\u021bia proiectelor depuse \u00een cadrul POR 2014-2020 \u0219i gradul de acoperire a aloc\u0103rii financiare disponibile, p\u00e2n\u0103 la data de 31.01.2023 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2023\/02\/Situatie-contracte-semnate-POR-2014-2020-la-31.01.2023.xlsx\" target=\"_blank\" rel=\"noopener\">Lista contractelor de finan\u021bare POR 2014-2020, semnate p\u00e2n\u0103 la data de 31.01.2023 \u00een Regiunea de Dezvoltare Nord-Vest, poate fi consult\u0103 aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2023\/01\/31.12.2022_Contractesemnate_POR14-20-AlocariActualizate.pdf\" target=\"_blank\" rel=\"noopener\">Situa\u021bia contractelor semnate \u00een cadrul POR 2014-2020 \u0219i gradul de contractare p\u00e2n\u0103 la data de 31.12.2022 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2023\/01\/31.12.2022_CFdepuse_POR14-20-AlocariActualizate.pdf\" target=\"_blank\" rel=\"noopener\">Situa\u021bia proiectelor depuse \u00een cadrul POR 2014-2020 \u0219i gradul de acoperire a aloc\u0103rii financiare disponibile, p\u00e2n\u0103 la data de 31.12.2022 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2023\/01\/Situatie-contracte-semnate-POR-2014-2020-la-31.12.2022.xlsx\" target=\"_blank\" rel=\"noopener\">Lista contractelor de finan\u021bare POR 2014-2020, semnate p\u00e2n\u0103 la data de 31.12.2022 \u00een Regiunea de Dezvoltare Nord-Vest, poate fi consult\u0103 aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/12\/30.11.2022_ContracteSemnate_POR14-20-AlocariActualizate.pdf\" target=\"_blank\" rel=\"noopener\">Situa\u021bia contractelor semnate \u00een cadrul POR 2014-2020 \u0219i gradul de contractare p\u00e2n\u0103 la data de 30.11.2022 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/12\/30.11.2022_CFdepuse-POR14-20-AlocariActualizate.pdf\" target=\"_blank\" rel=\"noopener\">Situa\u021bia proiectelor depuse \u00een cadrul POR 2014-2020 \u0219i gradul de acoperire a aloc\u0103rii financiare disponibile, p\u00e2n\u0103 la data de 30.11.2022 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/12\/Situatie-contracte-semnate-POR-2014-2020-la-30.11.2022.xlsx\" target=\"_blank\" rel=\"noopener\">Lista contractelor de finan\u021bare POR 2014-2020, semnate p\u00e2n\u0103 la data de 30.11.2022 \u00een Regiunea de Dezvoltare Nord-Vest, poate fi consult\u0103 aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/12\/31.10.2022_ContracteSemnate_POR14-20-AlocariActualizate.pdf\" target=\"_blank\" rel=\"noopener\">Situa\u021bia contractelor semnate \u00een cadrul POR 2014-2020 \u0219i gradul de contractare p\u00e2n\u0103 la data de 31.10.2022 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/12\/31.10.2022_CFdepuse-POR14-20-AlocariActualizate.pdf\" target=\"_blank\" rel=\"noopener\">Situa\u021bia proiectelor depuse \u00een cadrul POR 2014-2020 \u0219i gradul de acoperire a aloc\u0103rii financiare disponibile, p\u00e2n\u0103 la data de 31.10.2022 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-17\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/12\/Situatie-contracte-semnate-POR-2014-2020-la-31.10.2022.xlsx\" target=\"_blank\" rel=\"noopener\">Lista contractelor de finan\u021bare POR 2014-2020, semnate p\u00e2n\u0103 la data de 31.10.2022 \u00een Regiunea de Dezvoltare Nord-Vest, poate fi consult\u0103 aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-18\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/12\/30.09.2022_ContracteSemnate_POR14-20-AlocariActualizate.pdf\" target=\"_blank\" rel=\"noopener\">Situa\u021bia contractelor semnate \u00een cadrul POR 2014-2020 \u0219i gradul de contractare p\u00e2n\u0103 la data de 30.09.2022 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-19\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/12\/30.09.2022_CFdepuse_POR14-20-AlocariActualizate.pdf\" target=\"_blank\" rel=\"noopener\">Situa\u021bia proiectelor depuse \u00een cadrul POR 2014-2020 \u0219i gradul de acoperire a aloc\u0103rii financiare disponibile, p\u00e2n\u0103 la data de 30.09.2022 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-20\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/10\/Situatie-contracte-semnate-POR-2014-2020-la-30.09.2022.xlsx\">Lista contractelor de finan\u021bare POR 2014-2020, semnate p\u00e2n\u0103 la data de 30.09.2022 \u00een Regiunea de Dezvoltare Nord-Vest, poate fi consult\u0103 aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-21\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/09\/31.08.2022_ContracteSemnate_POR14-20.pdf\">Situa\u021bia contractelor semnate \u00een cadrul POR 2014-2020 \u0219i gradul de contractare p\u00e2n\u0103 la data de 31.08.2022 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-22\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/09\/31.08.2022_CFdepuse_POR14-20.pdf\">Situa\u021bia proiectelor depuse \u00een cadrul POR 2014-2020 \u0219i gradul de acoperire a aloc\u0103rii financiare disponibile, p\u00e2n\u0103 la data de 31.08.2022 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-23\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/09\/Situatie-contracte-semnate-POR-2014-2020-la-31.08.2022.xlsx\">Lista contractelor de finan\u021bare POR 2014-2020, semnate p\u00e2n\u0103 la data de 31.08.2022 \u00een Regiunea de Dezvoltare Nord-Vest, poate fi consult\u0103 aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-24\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/08\/29.07.2022_Contractesemnate_POR14-20.pdf\">Situa\u021bia contractelor semnate \u00een cadrul POR 2014-2020 \u0219i gradul de contractare p\u00e2n\u0103 la data de 29.07.2022 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-25\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/08\/29.07.2022_CFdepuse-POR14-20.pdf\">Situa\u021bia proiectelor depuse \u00een cadrul POR 2014-2020 \u0219i gradul de acoperire a aloc\u0103rii financiare disponibile, p\u00e2n\u0103 la data de 29.07.2022 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici.<\/a><\/td>\n<\/tr>\n<tr class=\"row-26\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/08\/Situatie-contracte-semnate-POR-2014-2020-la-31.07.2022.xlsx\">\tThe list of POR 2014-2020 financing contracts, signed until 31.07.2022 in the North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-27\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/07\/30.06.2022_ContracteSemnate_POR14-20.pdf\">\tThe status of contracts signed within the 2014-2020 ROP and the degree of contracting until 30.06.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-28\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/07\/30.06.2022_CFdepuse-POR14-20.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 30.06.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-29\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/07\/Situatie-contracte-semnate-POR-2014-2020-la-30.06.2022.xlsx\">\tThe list of POR 2014-2020 financing contracts, signed until 30.06.2022 in the North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-30\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/06\/31.05.2022_ContracteSemnate_POR14-20.pdf\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.05.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-31\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/06\/31.05.2022_CFdepuse_POR14-20.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.05.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-32\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/06\/Situatie-contracte-semnate-POR-2014-2020-la-31.05.2022.xlsx\">The list of financing contracts through ROP 2014-2020 signed until 31.05.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-33\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/05\/29.04.2022_ContracteSemnate_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 29.04.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-34\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/05\/29.04.2022_CFdepuse-POR14-20.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 29.04.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-35\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/05\/Situatie-contracte-semnate-POR-2014-2020-la-30.04.2022.xlsx\">The list of financing contracts through the 2014-2020 ROP signed, until 30.04.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-36\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/04\/Situatie-contracte-semnate-POR-2014-2020-la-31.03.2022.xlsx\">The list of financing contracts through the 2014-2020 ROP signed until 31.03.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-37\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/04\/31.03.2022_CFdepuse_POR14-20.pdf\"> The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.03.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-38\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/04\/31.03.2022_ContracteSemnate_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.03.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-39\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/03\/Situatie-contracte-semnate-POR-2014-2020-la-28.02.2022.xlsx\">The list of financing contracts through the 2014-2020 ROP signed until 28.02.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-40\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/04\/26.02.2022_ContracteSemnate_POR14-20.pdf\">The status of the contracts signed under the 2014-2020 ROP and the degree of contracting until 26.02.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-41\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/04\/26.02.2022_CFdepuse-POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 26.02.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-42\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/02\/Situatie-contracte-semnate-POR-2014-2020-la-31.01.2022.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.01.2022 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-43\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/01\/31.12.2021_Contracte_POR14-20-AlocariActualizate.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.12.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-44\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2022\/01\/31.12.2021_CFdepuse_POR14-20-AlocariActualizate.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.12.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-45\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/12\/Situatie-contracte-semnate-POR-2014-2020-la-31.12.2021.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.12.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-46\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/12\/29.11.2021_ContracteSemnate_POR14-20-AlocariActualizate.pdf\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 29.11.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-47\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/12\/29.11.2021_CFdepuse-AlocariActualizate-F.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 29.11.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-48\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/12\/Situatie-contracte-semnate-POR-2014-2020-la-30.11.2021.xlsx\">The list of financing contracts through the 2014-2020 ROP signed, until 30.11.2021, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-49\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/11\/29.10.2021_Contracte-semnate_POR14-20-AlocariActualizate.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 29.10.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-50\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/11\/29.10.2021_CFdepuse_POR14-20-AlocariActualizate.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 29.10.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-51\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/11\/Situatie-contracte-semnate-POR-2014-2020-la-31.10.2021-1.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.10.2021, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-52\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/10\/30.09.2021_ContracteSemnate_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 30.09.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-53\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/10\/30.09.2021_CFdepuse_POR14-20.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 30.09.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-54\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/10\/Situatie-contracte-semnate-POR-2014-2020-la-30.09.2021.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 30.09.2021, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-55\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/09\/31.08.2021_Contracte-semnate_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.08.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-56\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/09\/31.08.2021_CFdepuse_POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.08.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-57\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/09\/Situatie-contracte-semnate-POR-2014-2020-la-31.08.2021.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.08.2021, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-58\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/08\/30.07.2021_ContracteSemnate_POR14-20.pdf\">\tThe status of contracts signed within the 2014-2020 ROP and the degree of contracting until 30.07.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-59\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/08\/30.07.2021_CFdepuse_POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 30.07.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-60\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/08\/Situatie-contracte-semnate-POR-2014-2020-la-31.07.2021.xlsx\">The list of financing contracts through the 2014-2020 ROP signed, until 31.07.2021, in the North-West Development Region can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-61\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/07\/30.06.2021_ContracteSemnate_POR14-20.pdf\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 30.06.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-62\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/07\/30.06.2021_CFdepuse_POR14-20.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 30.06.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-63\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/07\/Situatie-contracte-semnate-POR-2014-2020-la-30.06.2021.xlsx\">The list of financing contracts through the 2014-2020 ROP signed, until 30.06.2021, in the North-West Development Region can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-64\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/05\/29.04.2021_ContracteSemnate_POR14-20.pdf\">\tThe status of the contracts signed under the 2014-2020 ROP and the degree of contracting until 31.05.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-65\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/06\/31.05.2021_CFdepuse_POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.05.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-66\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/06\/Situatie-contracte-semnate-POR-2014-2020-la-31.05.2021.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.05.2021, in the North-West Development Region can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-67\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/05\/29.04.2021_ContracteSemnate_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 29.04.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-68\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/05\/29.04.2021_CFdepuse_POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 29.04.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-69\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/04\/Situatie-contracte-semnate-POR-2014-2020-la-30.04.2021.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 30.04.2021, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-70\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/04\/01.04.2021_ContracteSemnate_POR14-20.pdf\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 1.04.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-71\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/04\/01.04.2021_CFdepuse_POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 1.04.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-72\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/04\/Situatie-contracte-semnate-POR-2014-2020-la-31.03.2021.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.03.2021, in the North-West Development Region can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-73\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/03\/28.02.2021_CFdepuse-POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 28.02.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-74\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/03\/28.02.2021_Contracte-semnate_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 28.02.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-75\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/03\/Situatie-contracte-semnate-POR-2014-2020-la-28.02.2021.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 28.02.2021, in the North-West Development Region can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-76\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/02\/31.01.2021_CFdepuse_POR14-20.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.01.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-77\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/02\/31.01.2021_ContracteSemnate_POR14-20.pdf\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.01.2021 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-78\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/02\/Situatie-contracte-semnate-POR-2014-2020-la-31.01.2021.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.01.2021, in the North-West Development Region can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-79\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2021\/01\/31.12.2020_CFdepuse_POR14-20.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.12.2020 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-80\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/12\/30.11.2020_ContracteSemnate_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 30.11.2020 in the North-West Development Region<\/a><\/td>\n<\/tr>\n<tr class=\"row-81\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/12\/Situatie-contracte-semnate-POR-2014-2020-la-30.11.2020.xlsx\">The list of financing contracts through the 2014-2020 ROP signed, until 30.11.2020, in the North-West Development Region can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-82\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/11\/31.10.2020_CFdepuse-POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.10.2020 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-83\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/11\/31.10.2020_Contracte-Semnate_POR14-20.pdf\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.10.2020 in the North-West Development Region<\/a><\/td>\n<\/tr>\n<tr class=\"row-84\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/11\/Situatie-contracte-semnate-POR-2014-2020-la-31.10.2020.xlsx\">The list of financing contracts through the 2014-2020 ROP signed, until 31.10.2020, in the North-West Development Region can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-85\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/10\/30.09.2020_CFdepuse_POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 30.09.2020 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-86\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/10\/30.09.2020_ContracteSemnate_POR14-20.pdf\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 30.09.2020 in the North-West Development Region<\/a><\/td>\n<\/tr>\n<tr class=\"row-87\">\n\t<td class=\"column-1\"><a href=\"https:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/10\/Situatie-contracte-semnate-POR-2014-2020-la-30.09.2020.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 30.09.2020, in the North-West Development Region can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-88\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/09\/31.08.2020_ContracteSemnate_POR14-20.pdf\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.08.2020 in the North-West Development Region<\/a><\/td>\n<\/tr>\n<tr class=\"row-89\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/09\/Situatie-contracte-semnate-POR-2014-2020-la-31.08.2020.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.08.2020, in the North-West Development Region can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-90\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/09\/31.08.2020_CFdepuse_POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.08.2020 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-91\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/08\/07.08.2020_CFdepuse-POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 07.08.2020 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-92\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/08\/07.08.2020_Contracte-Semnate_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 07.08.2020 North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-93\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/08\/Situatie-contracte-semnate-POR-2014-2020-la-07.08.2020.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 07.08.2020, in the North-West Development Region can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-94\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/08\/Tabel_2-1.jpg\">\tThe status of the 1,000 financing contracts through the 2014-2020 ROP, signed until 04.08.2020 in the North-West Development Region, can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-95\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/08\/Situatie-contracte-semnate-POR-2014-2020-la-31.07.2020.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.07.2020, in the North-West Development Region can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-96\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/07\/30.06.2020_CFdepuse-POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 30.06.2020 in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-97\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/07\/30.06.2020_Contracte-semnate_POR14-20.pdf\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 30.06.2020 North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-98\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/07\/Situatie-contracte-semnate-POR-2014-2020-la-30.06.2020.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 30.06.2020, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-99\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/06\/29.05.2020_Contracte-semnate_POR14-20.pdf\">The status of contracts signed within the 2014-2020 ROP and the degree of contracting up to 29.05.2020 Northwest Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-100\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/05\/Situatie-contracte-semnate-POR-2014-2020-la-29.05.2020.xlsx\">The list of financing contracts through the 2014-2020 ROP signed, until 29.05.2020, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-101\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/05\/30.04.2020_CFdepuse-POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 30.04.2020, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-102\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/04\/Situatie-contracte-semnate-POR-2014-2020-la-30.04.2020.xlsx\">The list of financing contracts through the 2014-2020 ROP signed, until 30.04.2020, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-103\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/04\/31032020_Contracte_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.03.2020 can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-104\">\n\t<td class=\"column-1\"><a href=\"http:\/\/Lista contractelor de finan\u021bare prin POR 2014-2020 semnate, p\u00e2n\u0103 la data de 31.03.2020, \u00een Regiunea de Dezvoltare Nord\u2013Vest se poate consulta aici\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.03.2020, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-105\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/03\/Situatie-contracte-semnate-POR-2014-2020-la-29.02.2020.xlsx\">The list of financing contracts through the 2014-2020 ROP signed, until 29.02.2020, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-106\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/02\/31.01.2020-Contracte-POR-2014-2020-semnate.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.01.2020 can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-107\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/02\/Situatie-contracte-semnate-POR-2014-2020-la-31.01.2020.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.01.2020, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-108\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/01\/Contracte-semnate-31.12.2019.xlsx\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.12.2019 can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-109\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2020\/01\/Situatie-contracte-semnate-POR-2014-2020-la-31.12.2019.xlsx\">The list of financing contracts through the 2014-2020 ROP signed, until 31.12.2019, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-110\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/12\/30.11.2019_CFdepuse_POR14-20.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 30.11.2019, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-111\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/12\/30.11.2019_Semnate_POR14-20-actualizat.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 30.11.2019 can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-112\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/11\/Situatie-contracte-semnate-POR-2014-2020-la-28.11.2019.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 28.11.2019, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-113\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/11\/CF-depuse-POR2014-2020-31.10.2019.xlsx\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.10.2019, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-114\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/11\/Contracte-semnate-POR2014-2020-31.10.2019.xlsx\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.10.2019 can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-115\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/11\/Situatie-contracte-semnate-POR-2014-2020-la-31.10.2019.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.10.2019, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-116\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/10\/Lista-contracte-semnate-POR-2014-2020-la-30.09.2019.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 30.09.2019, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-117\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/10\/30.09.2019_Contracte-Semnate_POR14-20.xlsx\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 30.09.2019 can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-118\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/09\/Situatie-contracte-semnate-POR-2014-2020-la-30.08.2019.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 30.08.2019, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-119\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/09\/30.08.2019_Contracte-Semnate_POR14-20.xlsx\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 30.08.2019 can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-120\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/08\/31.07.2019_CFdepuse-POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the financial allocation available until 31.07.2019 can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-121\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/08\/Situatie-contracte-semnate-POR-2014-2020-la-31.07.2019.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.07.2019, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-122\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/08\/31.07.2019_Contracte-semnate_POR14-20.pdf\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.07.2019 can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-123\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/07\/01.07.2019_CFdepuse_POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the financial allocation available until 01.07.2019 can be consulted here.<\/a><\/td>\n<\/tr>\n<tr class=\"row-124\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/07\/Situatie-contracte-semnate-POR-2014-2020-la-30.06.2019.xlsx\">The list of financing contracts through the 2014-2020 ROP signed, until 30.06.2019, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-125\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/07\/30.06.2019_ContracteSemnate_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 30.06.2019 can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-126\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/06\/Situatie-contracte-semnate-POR-2014-2020-la-31.05.2019.xlsx\">\tThe list of financing contracts through ROP 2014-2020 signed, until 31.05.2019, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-127\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2019\/06\/31.05.2019_Contracte-semnate_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 30.05.2019 can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-128\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Situatie-contracte-semnate-POR-2014-2020-la-30.04.2019.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 30.04.2019, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-129\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Contracte-semnate-30.04.2019-POR2014-2020.xlsx\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 30.04.2019 can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-130\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/31.03.2019_Contracte-semnate_POR14-20.pdf\">The status of signed contracts and the degree of contracting up to 31.03.2019, POR 2014-2020, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-131\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/31.03.2019_CFdepuse_POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP up to 31.03.2019, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-132\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Situatie-contracte-semnate-POR-2014-2020-la-31.03.2019.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.03.2019, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-133\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/28.02.2019-CF-depuse-POR-14-20.pdf\">The status of projects submitted under the 2014-2020 ROP up to 28.02.2019, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-134\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Situatii-Statistice.zip\">\tThe status of signed contracts and the degree of contracting up to 28.02.2019, POR 2014-2020, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-135\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Situatie-contracte-semnate-POR-2014-2020-la-31.12.2018.xlsx\">\tThe status of contracts signed up to 31.12.2018, POR 2014-2020, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-136\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/31.12.2018_CFdepuse-contractare_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.12.2018 can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-137\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Situatie-contracte-semnate-11.12.2018-POR-2014-2020_ADR-N-V.xlsx\">\tThe status of contracts signed up to 11.12.2018, POR 2014-2020, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-138\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Contracte-semnate-11.12.2018-POR-2014-2020_ADR-N-V.xlsx\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 11.12.2018, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-139\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Cereri-de-Finantare-depuse-pana-la-03.12.2018-POR-2014-2020_ADR-NV.xlsx\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 03.12.2018 in the North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-140\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Situatie-contracte-semnate-POR-2014-2020-la-15.10.2018.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 15.10.2018, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-141\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/CF-depuse-14.09.2018.xlsx\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 14.09.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-142\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Contracte-semnate-20.09.2018.xlsx\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 20.09.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-143\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Situatie-contracte-semnate-POR-2014-2020-la-31.08.2018-comunicare.xlsx\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 31.08.2018, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-144\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/CF-depuse-31.08.2018.xlsx\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.08.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-145\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Contracte-semnate-31.08.2018.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.08.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-146\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/02.08.2018_CFdepusePOR14-20.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 02.08.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-147\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Lista-contractelor-de-finan%C8%9Bare-prin-POR-2014-2020-semnatef1.pdf\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 08.08.2018, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-148\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/29.06.2018-CF-depuse.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 29.06.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-149\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/29.06.2018-Contracte-semnate.pdf\">\tThe status of contracts signed within the 2014-2020 ROP and the degree of contracting up to 29.06.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-150\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/CF-depuse31.05.2018-2.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.05.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-151\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Contracte-05.06.2018-iiiii.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 05.06.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-152\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2018\/05\/14.05.2018_Contracte_POR14-20.pdf\">\tThe analytical situation of the signing of REGIO financing contracts, on May 10, 2018, can be studied here Contracts_POR14-20 at 10.05<\/a><\/td>\n<\/tr>\n<tr class=\"row-153\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Situatie-contracte-semnate-POR-2014-2020-la-30.04.2018.xlsx\">The list of signed financing contracts, REGIO 2014-2020, until 20.04.2018 in the North-West Development Region can be consulted here Status of contracts signed POR 2014-2020 on 30.04.2018<\/a><\/td>\n<\/tr>\n<tr class=\"row-154\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2018\/04\/lista-contracte-30-martie.pdf\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 30.03.2018, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-155\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/CF-Contractate-30.03.2018-POR2014-2020.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 30.03.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-156\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/CF-Depuse-30.03.2018-POR2014-2020.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 30.03.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-157\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/lista-contracte-21-martie.pdf\">The list of financing contracts through the 2014-2020 ROP signed, until 21.03.2018, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-158\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/lista-contracte-POR_13-martie.pdf\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 13.03.2018, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-159\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/12.03.2018_ContracteSemnate_POR14-20.pdf\">The status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 12.03.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-160\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2018\/03\/02.03.2018_CFdepuse-POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 02.03.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-161\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Lista-contractelor-de-finan%C8%9Bare-prin-POR-2014.pdf\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 07.02.2018, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-162\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/CFdepuse_POR14-20_02.02.2018.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 02.02.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-163\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Contracte_POR14-20_06.02.2018.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 06.02.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-164\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/11.01.2018_CFdepuse_POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 11.01.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-165\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/11.01.2018_Contracte_POR14-20.pdf\">\tThe status of contracts signed within the 2014-2020 ROP and the degree of contracting up to 11.01.2018, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-166\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2018\/01\/Contracte-semnate-15.01.2017.pdf\">\tThe list of financing contracts through ROP 2014-2020 signed, until 29.12.2017, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-167\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2017\/12\/POR-14-20-proiecte-depuse-4dec.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 04.12.2017, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-168\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2017\/12\/POR-14-20_contracte-semnate-4dec.pdf\">\tThe status of contracts signed within the 2014-2020 ROP and the degree of contracting up to 04.12.2017, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-169\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2017\/12\/ctr-29-nov.pdf\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 29.11.2017, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-170\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Contracte-semnate-actualizat.pdf\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 20.11.2017, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-171\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Situatie-contracte-POR-2014-2020.pdf\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 1.11.2017, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-172\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/en\/cea-mai-recenta-situatie-depunerea-si-semnarea-de-proiecte-regio-2014-2020\/\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 1.11.2017 North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-173\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/contracte-25-oct..pdf\">The list of financing contracts through the 2014-2020 ROP signed, until 25.10.2017, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-174\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2017\/10\/Situatie-contractare-POR-2014-2020-1.pdf\">\tThe list of financing contracts through the 2014-2020 ROP signed, until 04.10.2017, in the North-West Development Region can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-175\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2017\/10\/4OCTOMBRIE_CFdepuse_POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 04.10.2017 North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-176\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2017\/10\/4OCTOMBRIE_Contracte_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 04.10.2017, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-177\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2017\/09\/4SEPT_CF_depuse-POR14-20.xls.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.08.2017 North-West Development Region, can be consulted here here<\/a><\/td>\n<\/tr>\n<tr class=\"row-178\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2017\/09\/4SEPT_Contracte-semnate_POR14-20.xls.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 31.08.2017, North-West Development Region, can be consulted here here<\/a><\/td>\n<\/tr>\n<tr class=\"row-179\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2017\/08\/31IULIE_CF_depuse_POR14-20-1.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 30.07.2017 North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-180\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2017\/08\/2August_ContracteSemnate_POR14-20.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting up to 02.08.2017, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-181\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/30IUNIE_CF_depusePOR14-20-REFACUTA.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 30.06.2017 North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-182\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Situatia-contractelor-semnate-%C3%AEn-cadrul-POR-2014-2020-%C8%99i-gradul-de-contractare-p%C3%A2n%C4%83-la-data-de-03.07.2017.pdf\">\tThe status of the contracts signed within the 2014-2020 ROP and the degree of contracting until 03.07.2017, North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-183\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/31Mai2017_CF_depuse_POR14-20.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.05.2017 North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-184\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/28Aprilie2017_CF_depuse_POR14-20.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 28.04.2017 North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-185\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2017\/04\/31Mart_CF_depuse_POR14-20-1.pdf\">\tThe status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 31.03.2017 North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-186\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/3Febr_CF_depuse_POR14-20.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until 03.03.2017 North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-187\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/27Ian_CF_depuse_POR14-20.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until January 27, 2017 North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-188\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2017\/01\/7.Decembrie_CF_depuse_POR14-20.xls-2.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until December 30, 2016 North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-189\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/Octombrie_CF_depuse_POR14-20-new.pdf\">The status of the projects submitted under the 2014-2020 ROP and the degree of coverage of the available financial allocation, until October 31, 2016 North-West Development Region, can be consulted here<\/a><\/td>\n<\/tr>\n<tr class=\"row-190\">\n\t<td class=\"column-1\"><a href=\"http:\/\/www.nord-vest.ro\/wp-content\/uploads\/2016\/08\/4onay_Situa%C5%A3ia-depunerii-de-proiecte-pe-REGIO-2014-2020-la-30-septembrie-2016.pdf\">The status of project submissions for REGIO 2014 \u2013 2020, as of September 30, 2016, here<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-1 from cache -->\n<\/div><\/div><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row us_custom_3191277e height_small\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\"><div class=\"wpb_column vc_column_container\"><div class=\"vc_column-inner\"><\/div><\/div><\/div><\/div><\/section><section class=\"l-section wpb_row us_custom_28082928 height_medium\"><div class=\"l-section-h i-cf\"><div class=\"g-cols vc_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_middle type_default stacking_default\" style=\"--columns-gap:1rem;\"><div class=\"wpb_column vc_column_container\" id=\"meniu-footer\"><div class=\"vc_column-inner\"><div class=\"g-cols wpb_row via_grid cols_1 laptops-cols_inherit tablets-cols_inherit mobiles-cols_1 valign_top type_default stacking_default\" style=\"--columns-gap:0.5rem;\"><div class=\"wpb_column vc_column_container us_custom_8ec37ca1\"><div class=\"vc_column-inner\"><nav class=\"w-menu for_simple_menu us_custom_7da95c6c navig layout_hor spread style_links us_menu_1\" style=\"--main-gap:0.5rem;--main-ver-indent:0.8em;--main-hor-indent:0.8em;--main-color:#1a1a1a;--main-hover-color:#ffffff;--main-active-color:#ffffff;\" id=\"indicator\"><ul id=\"menu-por-2014-2020\" class=\"menu\"><li id=\"menu-item-28265\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-28265\"><a href=\"https:\/\/www.nord-vest.ro\/en\/por-2014-2020\/ghiduri-2014-2020\/\">Guidelines 2014-2020<\/a><\/li><li id=\"menu-item-28269\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-28269\"><a href=\"https:\/\/www.nord-vest.ro\/en\/por-2014-2020\/instructiuni-am-por\/\">AM POR instructions<\/a><\/li><li id=\"menu-item-28268\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-28268\"><a href=\"https:\/\/www.nord-vest.ro\/en\/por-2014-2020\/identitate-vizuala-2014-2020\/\">Visual identity<\/a><\/li><li id=\"menu-item-28267\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-28267\"><a href=\"https:\/\/www.nord-vest.ro\/en\/por-2014-2020\/helpdesk\/\">Helpdesk<\/a><\/li><li id=\"menu-item-28263\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-28263\"><a href=\"https:\/\/www.nord-vest.ro\/en\/por-2014-2020\/decizii-cm-por\/\">CM POR decisions<\/a><\/li><li id=\"menu-item-28270\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-28270\"><a href=\"https:\/\/www.nord-vest.ro\/en\/por-2014-2020\/mysmis2014\/\">MySMIS<\/a><\/li><li id=\"menu-item-28264\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-28264\"><a href=\"https:\/\/www.nord-vest.ro\/en\/por-2014-2020\/evenimente-informatii-utile\/\">Events &amp; Useful Information<\/a><\/li><li id=\"menu-item-28266\" class=\"menu-item menu-item-type-post_type menu-item-object-page menu-item-28266\"><a href=\"https:\/\/www.nord-vest.ro\/en\/por-2014-2020\/ghiduri-2014-2020\/apeluri-regio-2014-2020\/\">REGIONAL CALLS 2014-2020<\/a><\/li><\/ul><style>@media ( max-width:600px ){.us_menu_1 .menu{display:block!important}.us_menu_1 .menu>li:not(:last-child){margin:0 0 var(--main-gap,0.5rem)!important}}<\/style><\/nav><\/div><\/div><\/div><\/div><\/div><\/div><\/div><\/section>","protected":false},"excerpt":{"rendered":"Home\/Pages Situa\u021bii statistice REGIO Lista contractelor de finan\u021bare POR 2014-2020, semnate p\u00e2n\u0103 la data de 31.03.2023 \u00een Regiunea de Dezvoltare Nord-Vest, poate fi consult\u0103 aici. Situa\u021bia contractelor semnate \u00een cadrul POR 2014-2020 \u0219i gradul de contractare p\u00e2n\u0103 la data de 28.02.2023 \u00een Regiunea de Dezvoltare Nord-Vest se poate consulta aici. Situa\u021bia proiectelor depuse \u00een cadrul...","protected":false},"author":42,"featured_media":0,"parent":18062,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":"","beyondwords_generate_audio":"0","beyondwords_integration_method":"","beyondwords_project_id":"","beyondwords_content_id":"","beyondwords_preview_token":"","beyondwords_player_content":"","beyondwords_player_style":"","beyondwords_language_code":"","beyondwords_language_id":"","beyondwords_title_voice_id":"","beyondwords_body_voice_id":"","beyondwords_summary_voice_id":"","beyondwords_error_message":"","beyondwords_disabled":"","beyondwords_delete_content":"","beyondwords_podcast_id":"","beyondwords_hash":"","publish_post_to_speechkit":"","speechkit_hash":"","speechkit_generate_audio":"","speechkit_project_id":"","speechkit_podcast_id":"","speechkit_error_message":"","speechkit_disabled":"","speechkit_access_key":"","speechkit_error":"","speechkit_info":"","speechkit_response":"","speechkit_retries":"","speechkit_status":"","speechkit_updated_at":"","_speechkit_link":"","_speechkit_text":""},"class_list":["post-27644","page","type-page","status-publish","hentry"],"publishpress_future_action":{"enabled":false,"date":"2026-08-24 17:04:21","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/pages\/27644","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/users\/42"}],"replies":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/comments?post=27644"}],"version-history":[{"count":1,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/pages\/27644\/revisions"}],"predecessor-version":[{"id":27909,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/pages\/27644\/revisions\/27909"}],"up":[{"embeddable":true,"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/pages\/18062"}],"wp:attachment":[{"href":"https:\/\/www.nord-vest.ro\/en\/wp-json\/wp\/v2\/media?parent=27644"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}